« Tools · Electrical Calculators
Transformer & Generator Sizing Calculator
Enter the loads one by one (power, cos φ, quantity, demand factor); the tool adds growth and spare margins and shows the standard transformer and generator rating.
Get a quote for solar PV design, power factor correction and electrical contracting for your facility; engineering consultancy is also available.
Get a Quote »How to use
- For each load enter name, power (kW), cos φ, quantity and demand factor (%); add more with "+ Add row".
- Set the growth margin, the transformer target loading and the generator margin.
- Total kW/kVA, average cos φ and the suggested standard transformer and generator ratings appear.
Method and assumptions
- Each row: P = kW × quantity × demand factor, S = P / cos φ. Total S is the arithmetic sum (real diversity is project specific).
- Transformer: the standard rating (50…3150 kVA) not below S × (1 + growth) / target loading. Generator: S × (1 + growth) × (1 + margin); the kW value is shown at 0.8 power factor.
- Large motor starting, harmonic loads (drives, UPS) and altitude/temperature derating for generators must be confirmed with the manufacturer.
Worked example
Two load groups: (a) 15 kW, power factor 0.85, 2 units, diversity 80%; (b) 8 kW, power factor 0.95, 1 unit, diversity 90%. Growth allowance 10%, target transformer loading 80%, generator reserve 20%.
| Row | P (kW) | S (kVA) |
|---|---|---|
| a: 15 × 2 × 0.80 | 24.0 | 28.2 |
| b: 8 × 1 × 0.90 | 7.2 | 7.6 |
| Total | 31.2 | 35.8 |
Overall power factor 0.87. With growth, apparent power is 35.8 × 1.10 = 39.4 kVA. For the transformer: 39.4 / 0.80 = 49.2 kVA → a 50 kVA standard transformer. For the generator: 39.4 × 1.20 = 47.3 kVA → 60 kVA (about 48 kW).
Standard ratings
| Device | Standard steps |
|---|---|
| Transformer (kVA) | 50, 100, 160, 250, 400, 630, 800, 1000, 1250, 1600, 2000, 2500, 3150 |
| Generator (kVA) | 10, 15, 20, 30, 40, 60, 80, 100, 125, 150, 200, 250, 315, 400, 500, 630, 800, 1000, 1250, 1500, 2000 |
Common mistakes
- Ignoring diversity: not all loads run together, but set the real value from the design rather than a low guess.
- Mixing kW and kVA: transformers and generators are rated in kVA, motors and heaters in kW; the power factor converts between them.
- Ignoring growth: leave a margin if the facility will expand.
- Forgetting motor starting: starting a large motor causes voltage and frequency dips on a generator; confirm with the manufacturer.
Frequently asked questions
What is the demand factor?
It is the share of the load operating at the same time (100 % means all together). Typical values come from design guides.
Why size the transformer for 80 % loading?
Transformers are commonly run at about 70–80 % of rating for spare capacity and life; you can change the ratio.
Is motor starting included for the generator?
No. The starting kVA of the largest motor must be checked separately when sizing the generator.
What is a diversity factor?
The share of load running at the same time. Lighting is close to 100%, motor loads usually lower; the exact value comes from the design.
Why size the transformer for 80% loading?
Leaving headroom instead of running a transformer at full load extends its life and leaves room for future load.
Is the result the final transformer selection?
No, it is a preliminary sizing. Harmonic loads, starting currents and altitude/temperature effects need separate assessment.
More tools
© ZDK Mühendislik — the software of this tool may not be copied or reused on other sites without permission.