« Tools · Electrical Calculators

Transformer & Generator Sizing Calculator

Enter the loads one by one (power, cos φ, quantity, demand factor); the tool adds growth and spare margins and shows the standard transformer and generator rating.

Calculations run in your browser; the data you enter is never sent to any server.

Get a quote for solar PV design, power factor correction and electrical contracting for your facility; engineering consultancy is also available.

Get a Quote »
Results are for preliminary design and checking only. Final design must follow the applicable standards, the manufacturer's catalogue and approval by a qualified engineer; ZDK Mühendislik accepts no liability for how results are used.

How to use

  1. For each load enter name, power (kW), cos φ, quantity and demand factor (%); add more with "+ Add row".
  2. Set the growth margin, the transformer target loading and the generator margin.
  3. Total kW/kVA, average cos φ and the suggested standard transformer and generator ratings appear.

Method and assumptions

  • Each row: P = kW × quantity × demand factor, S = P / cos φ. Total S is the arithmetic sum (real diversity is project specific).
  • Transformer: the standard rating (50…3150 kVA) not below S × (1 + growth) / target loading. Generator: S × (1 + growth) × (1 + margin); the kW value is shown at 0.8 power factor.
  • Large motor starting, harmonic loads (drives, UPS) and altitude/temperature derating for generators must be confirmed with the manufacturer.

Worked example

Two load groups: (a) 15 kW, power factor 0.85, 2 units, diversity 80%; (b) 8 kW, power factor 0.95, 1 unit, diversity 90%. Growth allowance 10%, target transformer loading 80%, generator reserve 20%.

RowP (kW)S (kVA)
a: 15 × 2 × 0.8024.028.2
b: 8 × 1 × 0.907.27.6
Total31.235.8

Overall power factor 0.87. With growth, apparent power is 35.8 × 1.10 = 39.4 kVA. For the transformer: 39.4 / 0.80 = 49.2 kVA → a 50 kVA standard transformer. For the generator: 39.4 × 1.20 = 47.3 kVA → 60 kVA (about 48 kW).

Standard ratings

DeviceStandard steps
Transformer (kVA)50, 100, 160, 250, 400, 630, 800, 1000, 1250, 1600, 2000, 2500, 3150
Generator (kVA)10, 15, 20, 30, 40, 60, 80, 100, 125, 150, 200, 250, 315, 400, 500, 630, 800, 1000, 1250, 1500, 2000

Common mistakes

  • Ignoring diversity: not all loads run together, but set the real value from the design rather than a low guess.
  • Mixing kW and kVA: transformers and generators are rated in kVA, motors and heaters in kW; the power factor converts between them.
  • Ignoring growth: leave a margin if the facility will expand.
  • Forgetting motor starting: starting a large motor causes voltage and frequency dips on a generator; confirm with the manufacturer.

Frequently asked questions

What is the demand factor?

It is the share of the load operating at the same time (100 % means all together). Typical values come from design guides.

Why size the transformer for 80 % loading?

Transformers are commonly run at about 70–80 % of rating for spare capacity and life; you can change the ratio.

Is motor starting included for the generator?

No. The starting kVA of the largest motor must be checked separately when sizing the generator.

What is a diversity factor?

The share of load running at the same time. Lighting is close to 100%, motor loads usually lower; the exact value comes from the design.

Why size the transformer for 80% loading?

Leaving headroom instead of running a transformer at full load extends its life and leaves room for future load.

Is the result the final transformer selection?

No, it is a preliminary sizing. Harmonic loads, starting currents and altitude/temperature effects need separate assessment.